120 S Broadway, Saratoga Springs, NY 12866

Saratoga Springs, NY • Capital Region · Saratoga County

120 S Broadway Mixed-Use

120 S Broadway, Saratoga Springs, NY 12866

Pre-Submission

What is it? · Identity & scale

Project type
Mixed-Use
Review stage
Pre-Submission

Who & what? · Context & documents

Developer / applicant entity
CCM Saratoga, LLC (Consultant: EDP)
Reviewing board
Planning Board

Site notes

Re-filing following expiration of earlier 2022/2023 multi-family approvals (Application #20221040). Sketch plan review (Project #20260416) for proposed mixed-use redevelopment in Neighborhood Center (T-5) District on former 64-unit hotel, spa, and pool parcel. Reconfigured proposal reduces curb cuts along S. Broadway from 2 to 1.

Plans & Documents

Public record & decisions

Applicant Claims

Applicant narrative projects revitalization of underutilized former hotel/spa parcel with mixed-use infill and anticipates improved pedestrian and vehicular safety by reducing curb cuts from 2 to 1.

Staff / Agency Concerns

Increased traffic on South Broadway corridor; pending full architectural and design review before the Design Review Board ().

Public Testimony

Planning Board initial sketch comments focused on vehicular access buffering and compliance; formal public hearing testimony has not yet opened.

Earlier record notes · source attribution pending

Older entries may combine applicant, agency, board and public comments. They are not classified as verified testimony.

Applicant narrative projects revitalization of underutilized former hotel/spa parcel with mixed-use infill and anticipates improved pedestrian and vehicular safety by reducing curb cuts from 2 to 1.

Increased traffic on South Broadway corridor; pending full architectural and design review before the Design Review Board ().

Board deliberation:Planning Board initial sketch comments focused on vehicular access buffering and compliance;
Hearing status:formal public hearing testimony has not yet opened.

The story behind it

Researched Oct 7, 2026 · Medium confidenceSupported by public records, with some gaps or single-source details.

120 South Broadway is a renewed redevelopment proposal on the former Grand Union Motel site. The 2026 assessment roll lists a Strategies LLC owner, while the current proposal names CCM Saratoga; a completed ownership transfer between them has not been verified.

History

The current applicant narrative says 2022 site-plan and special-use approvals expired after the previous applicant did not complete final-plan signatures; the original decisions and expiration record were not obtained. April 2026 reporting connected the ending Code Blue shelter lease at the property to a new permanent shelter location. A May 2026 narrative describes two frontage mixed-use buildings and two interior residential buildings on approximately 2.64 acres. May news coverage mentioned 68 units; that figure is not confirmed for the September version. The September 24 city agenda places application 20260416 at sketch review. Ownership evidence: the county-published 2026 final assessment roll, page 1274, identifies 120 South Broadway as parcel 178.35-1-6, with 2.62 acres and the truncated owner line “Strategies LLC Performing Asse.” It cites deed book 2016, page 1134, and also 1747/616. These are record references, not verified sale dates. July 14, 2022 Planning Board minutes name Stephen Ethier, Strategies LLC, Performing Assets as applicant for an earlier 58-unit proposal. The roll establishes the assessed owner but does not rule out a subsequent conveyance; the deed itself was not retrieved. The September 24 agenda establishes sketch review; it does not establish a final site-plan approval or a conveyance of title.

Who's involved

Owner listed in 2026 final assessment roll; subsequent transfer unverified
Strategies LLC (assessment owner line: “Strategies LLC Performing Asse”)
Applicant named with Strategies LLC, Performing Assets in July 14, 2022 city minutes; LLC membership not established
Stephen Ethier
Project entity named in current applicant narrative; transfer of legal title unverified
CCM Saratoga, LLC
Consultant and narrative preparer
Environmental Design Partnership, LLP
Associated with proposal in Albany Business Review preview; exact roles unverified
Bonacquisti Brothers Construction / The Krug Group
Relationship between assessment owner and current project entity
Developer relationship: Not yet verified

Claims & figures

  • ProjectionThe narrative proposes a single entrance, frontage sidewalk and civic-space areas; binding public-access conditions have not been verified. — Applicant narrative, May 2026
  • ProjectionThe proposed design would improve pedestrian safety and help revitalize the corridor. — Applicant narrative, May 2026

Connections

  • Environmental Design Partnership also appears as a service provider in The Roman at Cicero Commons (CBT-0033) materials. Shared professional services do not establish common ownership.
  • February 11, 2026 city Design Review Board minutes identify Jeremy Krug representing CCM Saratoga at 189 South Broadway. This documents the entity’s involvement in another South Broadway project; it does not establish Jeremy Krug’s LLC membership or ownership of 120 South Broadway. The January 2026 applicant packet for 189 South Broadway also names CCM Saratoga and identifies Jeremy Krug as project sponsor; this remains evidence for that other property, not proof of legal title at 120 South Broadway.

Open questions

  • Has title to parcel 178.35-1-6 transferred from the Strategies LLC entity listed on the 2026 assessment roll to CCM Saratoga, and what is CCM Saratoga’s documented ownership or contractual interest?
  • Who are the documented members or managers of the project LLC? The reviewed municipal records identify representatives but do not establish a complete membership roster.
  • What conditions applied to the 2022 approvals, and when did those approvals expire?
  • How many homes and how much commercial space are included in the latest proposal?
  • Would the proposed civic spaces have guaranteed public access?

Discrepancies noted

  • May reporting mentions 68 homes, but that figure has not been confirmed for the September proposal.
  • The 2026 assessment roll names a Strategies LLC entity, while current proposal materials name CCM Saratoga. These may be different owner and applicant roles; a deed transfer or ownership authorization is needed to establish the relationship.

Timeline

  1. 2022 — Earlier approvals reported by current applicant; original decisions not obtained.No figures reported.
  2. 2022-07-14 — City Planning Board minutes name Stephen Ethier, Strategies LLC, Performing Assets as applicant for the earlier proposal.58 homes in the 2022 proposal; not a current unit count.
  3. 2026-05 — Current applicant narrative and news coverage describe a new redevelopment proposal.Approximately 2.64 acres; news report mentions 68 units, not verified as current.
  4. 2026-09-24 — Planning Board agenda lists sketch review for application 20260416.No figures reported.

More in Saratoga Springs

624 N Broadway, Saratoga Springs, NY 12866

Saratoga Springs · Planning Board

624 N Broadway Multifamily

624 N Broadway, Saratoga Springs, NY 12866

Under ReviewPublic record notes available
Units
4
Sq ft
—
Stories
—
Cost
—
Crisafulli Associates · Updated Oct 4, 2026
359 Ballston Avenue, Saratoga Springs, NY 12866

Saratoga Springs · Planning Board

Saratoga Center for the Family Office Expansion

359 Ballston Avenue, Saratoga Springs, NY 12866

Approved
Sq ft
3,200
Stories
1
Cost
—
Saratoga Center for the Family · Updated Oct 4, 2026
269 Broadway, Saratoga Springs, NY 12866

Saratoga Springs · Planning Board

269 Broadway Mixed-Use

269 Broadway, Saratoga Springs, NY 12866

Under Review
Units
34
Comm SF
3,755
Stories
6
Cost
—
269 Broadway, LLC (Architect Mike Roman) · Updated Oct 4, 2026